SQL Server jobs run dates

$
0
0

Hi,

 I have a doubt. I created a "Test10" job in SQL Server 2012 to run as per below attached schedule. As per the schedule, job is supposed to run till 03-Feb-2014 2:00 AM but it stopped at 1:50 AM. This is really disturbing and don't know the cause of this failure. I created a similar job "Test11" and the end time that I gave is "02:01 AM". "Test11" job ran successfully but not "Test10".

 Has anyone experienced this situation before and do you think that the job is failed due to one or two seconds difference? Any theories?


If you feel that I have answered your question then please "Mark as Answer".