I am trying to capture the job duration time and put it on the customized Job email subject.
This is the original message from SQL server, the Bold one is what I am trying to capture.
JOB RUN: 'Hello' was run on 7/30/2014 at 8:05:00 AM
DURATION: 0 hours, 0 minutes, 2 seconds
STATUS: Succeeded
MESSAGES: The job succeeded. The Job was invoked by Schedule 27 (Job 2). The last step to run was step 1 (Test).
Is there anyway to do that? I have tried to pull it from jobhistory and I did't have any luck.
Cheers,
Matt