hi there:
I've created a job and schedule it to run every 5 mins. This job contains 2 steps. This job has been running for a while and I want to check it out. I saw this log file which is very confusing.
at 9/17/2014 2:10pm, it ran for 3 steps as supposed to be 2 steps. How is that possible?
Also there is no job running history at 2:05pm which is odd. I do know that this job was running very odd( extremely slow)
at 2:05pm...
Anyone saw this before? please feel free to share your experience.
Thanks
Hui
--Currently using Reporting Service 2000; Visual Studio .NET 2003; Visual Source Safe SSIS 2008 SSAS 2008, SVN --