What are the things I need to be concerned about?
I'm assuming the right thing to do is to start with the passive node, and then when that gets upgraded to 2012, do the principal.
What are the things I need to be concerned about?
I'm assuming the right thing to do is to start with the passive node, and then when that gets upgraded to 2012, do the principal.