Hello Experts-
I have a query that mergers data from server1(2008r2) with server2(2012) and updates some data. It uses two different databases in both server, I used to run this manually whenever requested by importing the tables to the 2012 server temporally. Now I have been asked to scheduled a job for it. My question is what will be the best way, please advise with the steps, thank you. And we don't have a linked sever between the two, and I am not thinking using the linked server two. Thank you for your help as always.